- home
- Prevention
- EIA
- Transboundary EIA procedures
- Transboundary EIA procedures, in which Bulgaria is affected country
- Construction of section 3 of rail corridor VIII: Kriva Palanka-Border with the Republic of Bulgaria
Construction of section 3 of rail corridor VIII: Kriva Palanka-Border with the Republic of Bulgaria
– Letter from Ministry of Environment and Physical Planning of the Republic of Macedonia (No11-2504 from 11 August 2017) with notification for investment proposal
| – Response from Ministry of Environment and Water of the Republic of Bulgaria (No 04-00-1504/05 Oct. 2017)
– Decision (No11-5508 from 14 November 2017) to determine the need for EIA of project 9 received by e-mail on 22 November 2017) and Non-technical Summary in bulgarian, macedonian and english language
– Letter ( No 04-00-1504 from 21 December 2017) from the Ministry of Environment and Water for Transboundary Part with EIA for the border section of the railway respectively Tunnel 22
– Letter (No 04-00-1504 from 02 April 2018) from Ministry of Environment and Water of Bulgaria