- home
- Prevention
- EIA
- Transboundary EIA procedures
- Transboundary EIA procedures, in which Bulgaria is country of origin
- Mining and Processing of Auriferous Ores from the Ada Tepe Prospect of the Khan Krum Gold Deposit, Krumovgrad Municipality
Mining and Processing of Auriferous Ores from the Ada Tepe Prospect of the Khan Krum Gold Deposit, Krumovgrad Municipality
-Notification from Ministry of Environment and Water of Bulgaria to Ministry of Foreign Affairs of Greece (No ОВОС 1402 from 10th August 2010)
-Response from Ministry for the Environment, Energy & Climate Change of Greece (from 24th August 2010)
-Letter from Ministry of Environment and Water of Bulgaria with Environment Impact Assessment Report, non-technical summary, Appropriate Assessment Report and other attachments (No ОВОС-2457 from 17 January 2011)
-Letter with opinions and comments on the EIA Report from the Ministry for the Environment, Energy & Climate Change of Greece (from 2nd May 2011)
-EIA Decision of Minister of Environment and Water of Bulgaria No 18-8, 11/2011 from 23 November 2011
documents
-
.pdf Non-technical summary_Final_EN TranslationDownload
-
.pdf Final EIA Ada tepe_FINAL_EN TranslationDownload
-
.pdf EIA Resolution BMM signed final EN TranslationDownload
-
.pdf DOVOS-G-53-2010Download
-
.pdf 101222_Final_Ada_Tepe_ENaDownload
-
.pdf vn-mai-2011-53-2010 (1)381b67c502d96a561fffa4d4a326f1ba277a12046a330de856e8d4b560bcccf8Download
-
.pdf otg_notifikacia-53-2010 (1)45c2e079d3ec47f877df77dc54dcd0c0faec956ee4f9ca607254d59409d7b100Download
-
.pdf Notifikacation_BMM_with_tableDownload
-
.pdf DOVOS-G-53-2010 (1)Download
-
.zip DownloadsDownload